FAQ | News | Photos | Track Map | Story | Contact Us | Home
 NOV 14 MINI OP SUMMARY  
Saturday, November 14, 2026
Category: Meet
Summary: a brief summary of the Nov 14 mini op. A total of 15 persons running 7 freight trains and 1 passenger train from 9:30 am until 3:00 pm.
Details: Greetings from WCRR:

The mini op session on Saturday Nov 14, 2026 was a success.  The weather was clowdy with temperature around 34 to 40 degrees.  We had 15 persons participating.

The freight cars were pre-staged on Friday Nov 13 when Richard blew leaves off the main line.  Saturday we began ops at a few minutes after 9 am.  We had a couple of new people to introduce to operating. As people arrived, they went to the car barn and selected cars to begin switching.

There were a total of 7 freight trains running although not more than 6 were operating at any one time because some arrived late or left early plus there was 1 passenger train that ran all day.  

  

We operated until 3 pm. We left all the cars on the RR as we will be having the final mini op session of 2026 next week Nov 21, 2026 from 9am - 2:30 pm. At 2:30 pm we will pick up all cars and return them to storage until 2027.

The mini op session three weeks ago on Oct 3, 2026 was also a success.  It was also a warm sunny day. I recall a total of 14 persons participated.   On Oct 3 we had 5 or 6 freights running, a yard switcher and 2 passenger trains running schedule 101 and 107.  107 runs exactly 30 minute after 101 so they meet each other at Summit.  Summit is not a good place to be switching when the passenger trains come thru in opposite directions.  

Back to the News Archive